At the end of June, a SUMAB R-500 block line was delivered to Mozdok.
04.07.2022
At the end of June, a SUMAB R-500 block line was delivered to Mozdok.
At the end of June, a SUMAB R-500 block line was delivered to Mozdok.
04.07.2022
At the end of June, a SUMAB R-500 block line was delivered to Mozdok.
21.06.2022
In June, a client from Australia visited our office in Sweden, as well as a production site in Serbia, together with a representative of SUMAB.
08.06.2022
In June, customers from Senegal visited Greece for production, together with a representative of SUMAB.
06.06.2022
At the beginning of June 2022, an elevator and a lowerator for the SUMAB R-400 were shipped to Hungary!
In May 2022, the SUMAB R-500 block line was delivered to Mozdok.
27.05.2022
At the end of May 2022, the SUMAB R-500 block line in LAGOM configuration was shipped to Mozdok.